Generic filters
Exact matches only
Search in title
Search in content
Search in excerpt

News Hub

mac-group sharpens its focus on critical infrastructure across the GCC

News Hub

Supporting the TEAS fibre network in Saudi Arabia

News Hub

mac-group opens Qatar office in Doha

News Hub

Join our growing GCC team

Archives

Autodesk-BIM-Fit-Out-Winner

Autodesk Phase 1 & 2

Autodesk Phase 1 & 2 1 Windmill Lane, Dublin 2   Project Overview Autodesk, Inc. is an American multinational software corporation that makes software products and services for the architecture, engineering, construction, manufacturing, media, education, and entertainment industries. Architectural Scope…

Read More
NTMA-Award-Winning

Treasury Docks – Dublin

Treasury Docks North Wall Quay, Dublin 1   Project Overview Our client, a State body which manages a complex portfolio of public assets and liabilities, were relocating from two buildings in Dublin City centre to a new facility on the…

Read More
BD-Medical-BIM

BD Medical Drogheda

BD Medical, Drogheda Donore Road, Drogheda, Co. Louth   Project Overview The BD Medical Drogheda project entails the extension of existing warehouse and service yard, and the refurbishment of existing production facility ASD4. Construction of a new ground floor and…

Read More
Autodesk-Phase-2-BIM

Autodesk Phase 2

Autodesk Phase 2, 1 Windmill Lane, Dublin 2 Fit Out of existing office block After the success of phase 1 for Autodesk EMEA HQ in 2018, mac were awarded phase 2 of this office fit out for Autodesk. Project Works:…

Read More
Autodesk-BIM-Fit-Out-Winner

Autodesk Phase 1

Autodesk Dublin Office fit out 1 Windmill Lane  Full office fit out and refurbishment of Autodesk EMEA HQ. This project consisted of a full office fit out of roughly 27,000 sq. ft, to the 2nd floor of 1 Windmill Lane,…

Read More
UnileverFeatured-01

Unilever

Project Jewel Burton-on-Trent   Project Overview Construction of a new Unilever warehouse facility 65,000 sq ft and refurbishment of an existing 65,000 sq ft warehouse. The works were carried out at an existing food processing plant working within a live…

Read More
Oracle-Block-C-BIM

Oracle – Block C

Oracle Phase 2 – Block C – Base Build & Fit Out   A 54,000 sq. ft design and build contract to deliver new office space. This block had a live Data Centre serving the campus that had to be…

Read More
Bristol-Myers-Squib-Cruiserath-BIM-LEED

Bristol-Myers Squibb – Cruiserath

Bristol-Myers Squibb – Cruiserath mac partnered with Jacobs Engineering to develop the pharmaceutical CAT B fit out of a new build structure for Bristol-Myers Squibb and their pharmaceutical facilities in Cruiserath. The project included the main labs, offices and canteen…

Read More
Oracle-Block-A-LEED-BIM

Oracle – Block A

Oracle Block A – Phase 3 – Base Build & Fit Out   Project Overview A 76,000 sq. ft live design & build project including a full CAT A & B refurbishment. The project involves connecting 2 existing buildings together…

Read More
Oracle-Block-B-BIM-LEED

Oracle – Block B

Oracle Block B – Phase 1 – Base Build & Fit Out   With the completion of Block B, mac achieved our first ever LEED Platinum Certification, the highest certification a project can achieve. This project included a full Cat…

Read More