The project involved the full strip out and fit out of the ground floor, movement of staff from temporary first floor space to newly fitted space before carrying out the same procedure for the second floor.
| Size: | 32,000 sq. ft. |
| Duration: | 26 weeks |
| Team: | Jacobs |