Autodesk Phase 2, 1 Windmill Lane, Dublin 2 Fit Out of existing office block After the success of phase 1 for Autodesk EMEA HQ in 2018, mac were awarded phase 2 of this office fit out for Autodesk. Project Works:…
Read More
One Blythe Gate, Blythe Valley Business Park, Solihull Refurbishment, alterations and extension of this 3 storey commercial building. The project works include: CAT A fit out of the office space M&E system upgrades and replacement Extension works Reception atrium Roof…
Read More
Crux Product Design Full CAT A and CAT B fit out which provides Crux Product Design Limited with their new office headquarters in Bristol. mac worked closely with Crux to ensure that all of their future needs would be met…
Read More
Global Banking Corporation – European Headquarters mac completed this project for a global banking corporation which covered 38,000 sq. ft. of high grade office spread over 3 floors. mac took the existing shell & core space to a CAT B…
Read More
PayPal Headquarters Ireland PayPal architectural refresh of the existing PayPal offices in Ballycoolin, Dublin. This PayPal architectural refresh to buildings 2, 3, 4 and 5 will be completed over multiple phases. Building 2: “One of the older buildings in PayPal’s…
Read More
Baldonnell Business Park Unit A Fit Out Fit out at Unit A Baldonnell business park for Mountpark, spanning over 118,000 sq. ft. The project works include: First floor office CAT B fit out including data and furniture Ground Floor Canteen…
Read MoreThe Eight Building Newmarket Square, Dublin 8 Project Overview mac was awarded the shell and core construction of The 8 Building, Newmarket Square, Dublin, 8. This 118,000 sq.ft. commercial building consists of a single storey basement car park with…
Read More
عندما قررت mac الانتقال إلى مساحة أكبر، أرادت موقعاً يتماشى مع فكرة مدينة دبلن المزدهرة والمستدامة، ولذلك اخترنا موقعاً بجوار محطة ترام “بالالي لواس” مباشرةً لتمكين الزوار والموظفين من الوصول إلينا بسهولة عبر وسائل النقل العام. تبلغ مساحة المكتب الجديد…
Read More
When mac decided to move to a larger space, they wanted a location that was aligned with the idea of a thriving, sustainable Dublin, and so we located right beside the Balally Luas stop so that visitors and staff could…
Read More
Autodesk Dublin Office fit out 1 Windmill Lane Full office fit out and refurbishment of Autodesk EMEA HQ. This project consisted of a full office fit out of roughly 27,000 sq. ft, to the 2nd floor of 1 Windmill Lane,…
Read More
The Atrium Blackstone Project Overview mac completed a full CAT A fit out of the Atrium Block B building, at Sandyford Business Park, Dublin 18, from Ground to 5th floor. This project achieved a LEED Gold rating. Project…
Read More
One Microsoft Court Reconfiguration Project South County Business Park, Leopardstown, Dublin 18 Project Overview A full strip-out and high specification refurbishment of 106,000 sq.ft. of office space along with demolition and refurbishment of full height atrium space & ground…
Read More