Generic filters
Exact matches only
Search in title
Search in content
Search in excerpt

News Hub

mac-group sharpens its focus on critical infrastructure across the GCC

News Hub

Supporting the TEAS fibre network in Saudi Arabia

News Hub

mac-group opens Qatar office in Doha

News Hub

Join our growing GCC team

Archives

Autodesk-Phase-2-BIM

Autodesk Phase 2

Autodesk Phase 2, 1 Windmill Lane, Dublin 2 Fit Out of existing office block After the success of phase 1 for Autodesk EMEA HQ in 2018, mac were awarded phase 2 of this office fit out for Autodesk. Project Works:…

Read More
IM Properties walkway

IM Properties

One Blythe Gate, Blythe Valley Business Park, Solihull Refurbishment, alterations and extension of this 3 storey commercial building. The project works include: CAT A fit out of the office space M&E system upgrades and replacement Extension works Reception atrium Roof…

Read More
crux featured

Crux Product Design

Crux Product Design Full CAT A and CAT B fit out which provides Crux Product Design Limited with their new office headquarters in Bristol. mac worked closely with Crux to ensure that all of their future needs would be met…

Read More
Global-Banking-EMEA-LEED

Global Banking Corporation – European Headquarters

Global Banking Corporation – European Headquarters mac completed this project for a global banking corporation which covered 38,000 sq. ft. of high grade office spread over 3 floors. mac took the existing shell & core space to a CAT B…

Read More
PayPal-Building-2

PayPal HQ – Building 2

PayPal Headquarters Ireland PayPal architectural refresh of the existing PayPal offices in Ballycoolin, Dublin. This PayPal architectural refresh to buildings 2, 3, 4 and 5 will be completed over multiple phases. Building 2: “One of the older buildings in PayPal’s…

Read More
Mountpark-Fit-Out-Interiors

Mountpark Unit A Fit Out

Baldonnell Business Park Unit A Fit Out Fit out at Unit A Baldonnell business park for Mountpark, spanning over 118,000 sq. ft.   The project works include: First floor office CAT B fit out including data and furniture Ground Floor Canteen…

Read More

The Eight Building

The Eight Building Newmarket Square, Dublin 8   Project Overview mac was awarded the shell and core construction of The 8 Building, Newmarket Square, Dublin, 8. This 118,000 sq.ft. commercial building consists of a single storey basement car park with…

Read More
DubHub المميز

mac DubHub

عندما قررت mac الانتقال إلى مساحة أكبر، أرادت موقعاً يتماشى مع فكرة مدينة دبلن المزدهرة والمستدامة، ولذلك اخترنا موقعاً بجوار محطة ترام “بالالي لواس” مباشرةً لتمكين الزوار والموظفين من الوصول إلينا بسهولة عبر وسائل النقل العام. تبلغ مساحة المكتب الجديد…

Read More
DubHub featured

mac DubHub

When mac decided to move to a larger space, they wanted a location that was aligned with the idea of a thriving, sustainable Dublin, and so we located right beside the Balally Luas stop so that visitors and staff could…

Read More
Autodesk-BIM-Fit-Out-Winner

Autodesk Phase 1

Autodesk Dublin Office fit out 1 Windmill Lane  Full office fit out and refurbishment of Autodesk EMEA HQ. This project consisted of a full office fit out of roughly 27,000 sq. ft, to the 2nd floor of 1 Windmill Lane,…

Read More
The-atrium-LEED

The Atrium

The Atrium Blackstone   Project Overview mac completed a full CAT A fit out of the Atrium Block B building, at Sandyford Business Park, Dublin 18, from Ground to 5th floor. This project achieved a LEED Gold rating.   Project…

Read More
One-Microsoft-Court-Fit-Out-Winner

One Microsoft Court

One Microsoft Court Reconfiguration Project South County Business Park, Leopardstown, Dublin 18   Project Overview A full strip-out and high specification refurbishment of 106,000 sq.ft. of office space along with demolition and refurbishment of full height atrium space & ground…

Read More