Generic filters
Exact matches only
Search in title
Search in content
Search in excerpt

News Hub

mac-group sharpens its focus on critical infrastructure across the GCC

News Hub

Supporting the TEAS fibre network in Saudi Arabia

News Hub

mac-group opens Qatar office in Doha

News Hub

Join our growing GCC team

Archives

DocuSign-EMEA-Fit-Out-Winner

DocuSign

DocuSign – 5 هانوفر كاي، دبلن نظرة عامة على المشروع تعد شركة DocuSign, Inc. شركة أمريكية يقع مقرها الرئيسي في سان فرانسيسكو، كاليفورنيا، وتتيح للمؤسسات إدارة الاتفاقيات الإلكترونية كجزء من سحابة اتفاقيات DocuSign. تعاقدت Docusign مع mac-group لتنفيذ مقرها الجديد…

Read More

Trident House

Trident House – Full Landlord Refurbishment    Project Overview A full landlord refurbishment of Trident House. All floors have open-plan floorplates while the double-height reception area and lobby were redeveloped to have a contemporary feel.   Project Works The new…

Read More
Tyndale House

Tyndale House

Tyndale House Oxford   Project Overview Refurbished office accommodation at Tyndale House, Oxford, a strip-out, extension and refurbishment project. A CAT A fit out of a 4 floor office building with a ground floor commercial unit at Tyndale House, Cowley…

Read More
Starwood lobby

Starwood

Starwood Stephen’s Green Reception Upgrade  mac-group completed a dynamic, high end fit out for Starwood capital comprising a new reception and lobby area to No. 75  St. Stephens Green. Upgrade of finishes to the main reception lobby which included new…

Read More

Equinix

Equinix London CAT B Fit Out – 6-7 Harbour Exchange, London. CAT B fit out for Equinix at Harbour Exchange in London. This project was completed over 12 weeks. Project details: Strip out of the existing security office and formation…

Read More
Blue-Lion-Place-BREEAM

Blue Lion Place

Blue Lion Place – London Demolition of existing building to create a new one which makes a positive architectural contribution to the character & appearance of the area with timber batten façade, Crittal style windows & brick plinth base to…

Read More
PwC Reception

PwC Reception

PwC Spencer Dock Reception Upgrade    Project Overview This project consisted of a complete strip out and refurbishment of the main reception lobby.   Project works New speed lanes Floor finishes Reception desk Feature joinery display cabinets along with three…

Read More
Autodesk-Phase-2-BIM

Autodesk Phase 2

Autodesk Phase 2, 1 Windmill Lane, Dublin 2 Fit Out of existing office block After the success of phase 1 for Autodesk EMEA HQ in 2018, mac were awarded phase 2 of this office fit out for Autodesk. Project Works:…

Read More

Clockwise River House

Clockwise River House – D&B Office fit out, River House, High St., Belfast D&B office fit out of Castleforge Partners, Clockwise after completing the CAT A refurbishment of River House, the largest city centre commercial refurbishment development in Belfast. High…

Read More
Hayes Solicitors-DSC_0778

Hayes Solicitors

Hayes Solicitors Office St Stephens Green House mac-group completed a CAT B office fit out and refurbishment for Hayes Solicitors Office at St Stephens Green House, 6 Earlsfort Terrace, Dublin 2. The project works comprised of demolition works, alterations to…

Read More
IM Properties walkway

IM Properties

One Blythe Gate, Blythe Valley Business Park, Solihull Refurbishment, alterations and extension of this 3 storey commercial building. The project works include: CAT A fit out of the office space M&E system upgrades and replacement Extension works Reception atrium Roof…

Read More
crux featured

Crux Product Design

Crux Product Design Full CAT A and CAT B fit out which provides Crux Product Design Limited with their new office headquarters in Bristol. mac worked closely with Crux to ensure that all of their future needs would be met…

Read More