Generic filters
Exact matches only
Search in title
Search in content
Search in excerpt

News Hub

mac-group sharpens its focus on critical infrastructure across the GCC

News Hub

Supporting the TEAS fibre network in Saudi Arabia

News Hub

mac-group opens Qatar office in Doha

News Hub

Join our growing GCC team

Archives

Autodesk-BIM-Fit-Out-Winner

Autodesk Phase 1

Autodesk Dublin Office fit out 1 Windmill Lane  Full office fit out and refurbishment of Autodesk EMEA HQ. This project consisted of a full office fit out of roughly 27,000 sq. ft, to the 2nd floor of 1 Windmill Lane,…

Read More
The-atrium-LEED

The Atrium

The Atrium Blackstone   Project Overview mac completed a full CAT A fit out of the Atrium Block B building, at Sandyford Business Park, Dublin 18, from Ground to 5th floor. This project achieved a LEED Gold rating.   Project…

Read More
One-Microsoft-Court-Fit-Out-Winner

One Microsoft Court

One Microsoft Court Reconfiguration Project South County Business Park, Leopardstown, Dublin 18   Project Overview A full strip-out and high specification refurbishment of 106,000 sq.ft. of office space along with demolition and refurbishment of full height atrium space & ground…

Read More
DPS featured

DPS Engineering

Citywest Dublin Fit Out Design and build contract for DPS Engineering. A CAT B fit out of the ground floor and the 1st floor of 3096 Lake Drive, Citywest Business Park, Dublin. The project comprised of 20,000 sq.ft and is…

Read More
UnileverFeatured-01

Unilever

Project Jewel Burton-on-Trent   Project Overview Construction of a new Unilever warehouse facility 65,000 sq ft and refurbishment of an existing 65,000 sq ft warehouse. The works were carried out at an existing food processing plant working within a live…

Read More
Liverpool Echo. Exterior facade.

Reach PLC, Liverpool Echo

Echo Place, Liverpool Echo Project Overview Complete refurbishment of the former Liverpool Echo building at Old Hall Street, Liverpool. A large construction cut and carve job complete with bedroom fit out. Project Works A full conversion of these former offices…

Read More
ADDOFoodGroupmac-group

Addo Food Group

Addo Food Group internal modifications This was a project located within an existing facility at Tottle Bakery. Internal modifications at Addo Food Group to tray wash lines and jelly production areas within the production facility. Nigel with the back office support…

Read More
optum operations office

Optum Operations

Optum Operations, Letterkenny   The first building fit out is complete at Optum with two more to go. It was a challenging programme working with many new subcontractors and suppliers in a new location. Project works Demo of existing fit…

Read More
HOUGHTON MIFFLIN HARCOURT Dublin Office Fitout

Houghton Mifflin Harcourt

Houghton Mifflin Harcourt Refurbishment  CAT B refurbishment across 2 floors in Trinity Plaza. The objective was to reconfigure the existing office space to increase desk numbers with new finishes and new specialist joinery installations including new tea stations. This project…

Read More
salesforce dublin office

Salesforce

CAT B fit out across one floor for Salesforce Sandyford. The project involved modifications and additions to the existing MEP services to the client’s ‘Ohana’ global specification. The installation included relocation of existing FCU’s and associated services and the installation…

Read More
MCCP Colourful Office

MCCP

Project overview from the designer and PM, Barbara Dooley. MCCP were looking to relocate their head office from Sir John Rogerson’s Quay, to Great Strand Street. The brief was fascinating. The company is a marketing and advertising group, with style….

Read More
مكتب MCCP الملون

MCCP

نظرة عامة على المشروع من المصممة ومديرة المشروع، باربرا دولي. كانت شركة MCCP تتطلع لنقل مقرها الرئيسي من “سير جون روجرسون كواي” إلى شارع “غريت ستراند”. كان موجز المشروع رائعاً؛ فالشركة هي مجموعة تسويق وإعلان تتمتع بأسلوب خاص، وتضم الكثير…

Read More