Generic filters
Exact matches only
Search in title
Search in content
Search in excerpt

News Hub

mac-group sharpens its focus on critical infrastructure across the GCC

News Hub

Supporting the TEAS fibre network in Saudi Arabia

News Hub

mac-group opens Qatar office in Doha

News Hub

Join our growing GCC team

Archives

U164_Publicis-Groupe_Eden-HouseLondon_Cover_400x400_001

Publicis Groupe

Publicis Groupe, London   Project Overview mac carried out the office fit out to 2 floors to include a contemporary feature staircase, full mechanical and electric installation, raised access flooring along with architectural mood lighting throughout the space.

Read More
Jet-Cover_400x400_001

Jet.com

CAT B office fit out of Ground, 3rd, 4th & 5th floor.   Project works include:  Construction of plasterboard and glazed partitions, plasterboard bulkheads and suspended raft ceilings Re-routing existing M&E services Installation of new M&E and Data services Specialist…

Read More
Bitmap - 29

Glasshouse Yard

Glasshouse Yard London Refurbishment Full strip-out and refurbishment to the existing office space at Glasshouse Yard London spanning from the basement to the third floor. This project was a complete fit out to a CAT A standard for Glasshouse Yard…

Read More
Oracle-Block-C-BIM

Oracle – Block C

Oracle Phase 2 – Block C – Base Build & Fit Out   A 54,000 sq. ft design and build contract to deliver new office space. This block had a live Data Centre serving the campus that had to be…

Read More
hibernia_REIT_dockland_central_reception

Hibernia Reit – One & Two Dockland Central

Dockland Central Significant alterations and refurbishments for our Client Hibernia Reit on both One Dockland Central and Two Dockland Central   One Dockland Central This involved the strip out of 3 floors within the building back to ‘grey box’ and…

Read More
75-St-Stephens-Green-1

Lone Star Funds

Lone Star Funds   Project Overview Installation and upgrade of new ESB Switch Station Project Works Chiller plant room LV board Trench heaters & ducting in a limited 200mm floor void/plenum space Dry air coolers and new rooftop plant room…

Read More
75-St-Stephens-Green-1

Lone Star Funds

Lone Star Funds نظرة عامة على المشروع تركيب وتحديث محطة تحويل ESB جديدة أعمال المشروع غرفة محطة التبريد لوحة الجهد المنخفض سخانات الخنادق ومجاري الهواء في مساحة فراغ أرضية محدودة تبلغ 200 مم مبردات الهواء الجاف وغرفة محطة سطح جديدة…

Read More
Swansea-Great-Hall-BREEAM-Award-winning

The Great Hall – Swansea University

The Great Hall Swansea University   Project Overview The Great Hall Swansea University was a Cat B Design & Build fit out of the university’s auditorium (NR 16 acoustic rated) including a 250 seat restaurant over 36,000 sq. ft. Specialist…

Read More
Castleforge Bristol Lobby

Castleforge Partners – Bristol

Castleforge Partners Bristol Landlord Renovation As a testament to our ability to deliver, satisfaction and dedication to our clients’ mac are once again engaging with Castleforge Partners on their latest project at One Cathedral Square situated in the heart of…

Read More
506_RCSI-15.jpg-400x400

Royal College of Surgeons Ireland

Royal College of Surgeons Ireland, Ardilaun House   Project Overview CAT A building upgrade of 6 floors initially for landlord and Cat B project for the new tenant at Block C, Ardilaun House. Project was also BCAR.   Scope of…

Read More
projects-350_0006_Grand-Canal-Plaza

Rohan Holdings

Rohan Holdings, 2 Grand Canal Plaza   Project Overview Landlord strip out and refurbishment   Project works Structural steel modifications. First floor cut back to create a double-height reception. Other works include a specialist joinery, revolving door install and stone…

Read More
Cobham-House096-1

Castleforge Partners – Cobham House

Castleforge Partners Cobham House CAT A Reinstatement A 32,000 sq. ft. CAT A landlord reinstatement across a total of eight floors at Cobham House in London. This project included: Full sash window refurbishment A new curtain wall was installed on…

Read More